Project budgets are established within the Project Budget tab within the Project Profile. Budgets are typically entered through the user interface (typed into the budget screen), although it is also possible to import them. Budgets may be entered at the Task level or the Project level. Unanet does not require that the sum of task budgets equal the project budgets. If, however, you would like the sum of the task budgets to equal the project budget, you can perform an export of task budgets to sum the task budgets and import into the project budget fields. This means that budgets would be maintained at the task level by a project manager type role and only populated at the project level budgets via the import.